Home
About Us
Our Approach
History
Management
Awards
Our Divisions
Mechanical Oil and Gas Division
Electrical Division
Civil Division (Industrial and Buildings)
Marine Division
Projects
Resources
Vendors
News and Highlights
Contact Us
Qatalum Project-Service Areas and Potroom Building
Client: QEWC
Lead Division:
Electrical Division
Client:
QEWC
Location:
Qatar, Qatar
Start Year:
2008
Project Status:
Completed
Completion Year:
2011
Residual engineering, installation and commissioning of 220kV & 33kV substation equipment.
Back to Projects
Related Projects
EMAL Smelter Complex Project – Above Ground Electrical and Instrumentation Works
Replace Sales Gas Compressor Motor at UGP & SGP
Borouge 3 Utilities & Offsites Project – Electrical Work
Design and Construction of Buildings and Civil Works
Replace 4.16KV Motor Control Gear at Shedgum and Uthmaniyah
EPC Contract No : 017661-SG-2185 Power Plant Electrical Testing
Buhasa Power Interconnection Upgrade
Ras Abu Fontas Phase A1, Electrical and I & C Erection works, Qatar
Upgrade Gas Compression Plant Power Distribution at Tanajib
1 x 400kV Substation - Al-Ain South-West
New Custody Transfer Metering Skid for Shuweihat -3
Mesaieed Combined Cycle Power Project (IBM)
Casthouse – General Electrical, Control & Instrumentation Installation, Taweelah, Abu Dhabi
Barzan Project - 11kv Power Distribution Network
Upgrade of Halul Phase 1, EVSD, DMS AND CMS Panels
Three New 132/22kV Substations in Reem Island
400/132 KV Gridstation at Fujairah-Erection Works (FGS)
New 400/1132/22kV Gridstation at Al Reem Island and associated 400kV Cable works - Lot I - Substation Works - Electrical Erection Work
EPC Works for Substation- 4, 5, T1, T2 and 2; Upgrade and Replacement of Substations - Phase 2 and 3 Project, Abu Dhabi, Das Island
Electro Mechanical Pre-Commissioning Testing Package No. 270-HC4-MMT0-00070 Project- Al Taweelah Alumina , Abu Dhabi
EPC for Critical I & C Systems Upgrade at Das Island
HABSHAN & BAB Control Systems Upgrade Project
EPC Works for Switchgear Replacement at Zirku